Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/10495/31754
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorValencia Velásquez, Jaime Alejandro-
dc.contributor.advisorMolina Ramirez, Natalia-
dc.contributor.authorAlvarez Gaviria, Vladimir-
dc.date.accessioned2022-11-03T21:37:23Z-
dc.date.available2022-11-03T21:37:23Z-
dc.date.issued2022-
dc.identifier.urihttps://hdl.handle.net/10495/31754-
dc.description.abstractRESUMEN : En el presente informe se planea conectar un proyecto fotovoltaico de 60 MW al SIN. Para la conexión del proyecto solar se analizaron 2 alternativas en el horizonte 2025 y 2030: Alternativa 1: Conexión de la planta a la Subestación 1 en 115 kV, mediante un circuito sencillo de 5,35 km. Alternativa 2: Conexión de la planta a la Subestación 2 en 115 kV, mediante un circuito sencillo de 79,25 km. Para las alternativas de conexión planteadas, se realizan simulaciones de flujo de carga, cortocircuito, estabilidad dinámica, transitoria y evaluación económica. Los resultados obtenidos del flujo de carga muestran que la conexión del parque solar al SIN presenta un buen desempeño técnico mediante cualquiera de las alternativas de conexión en los dos años de estudio para todos los escenarios evaluados, en condiciones normales de operación. Por otra parte, de los análisis de contingencias N-1, se encuentra que ante la salida de los elementos Transformador A, Línea A y Línea C, se generan sobrecargas tanto en el Caso Base como en la conexión de la Alternativa 1 y la Alternativa 2. La condición evidenciada es propia de la red y asociada a las condiciones de demanda esperadas en el sistema. Los análisis técnicos de cortocircuito y estabilidad muestran que, con el ingreso de la planta mediante cualquiera de las alternativas analizadas, y ante la ocurrencia de cualquiera de los eventos simulados, el sistema presenta un comportamiento adecuado, manteniendo sus variables dentro de rangos aceptables, tanto en estado estable como transitorio. Los resultados de la evaluación económica muestran que la Alternativa 1 es mejor que la Alternativa 2, ya que tiene una relación B/C mayor y los costos de inversión son menores.spa
dc.description.abstractABSTRACT : This report studies the connection of a 60 MW PV Project to the SIN (Sistema Interconectado Nacional). For the connection of the solar project, two alternatives are analyzed in the horizon of 2025 and 2030. Alternative 1: Connection of the plant to the Substation 1 in 115 kV, through a simple circuit of 5,35 km. Alternative 2: Connection of the plant to the Substation 2 in 115 kV, through a simple circuit of 79,25 km. For the proposed alternatives, simulations like load flow, shortcircuit, dynamic and transient stability, and economic evaluation are performed. The results obtained from the load flow shows that the connection of the solar park to the SIN presents a good technical performance in the two years of study and for all the scenaries evaluated, under normal operating conditions. On the other hand, from the N-1 contigencies analysis, it can be seen that after the outage of the Transformer A, Line A and Line C, overloads are generated both in the base case and with the connection of Alternative 1 and Alternative 2. This condition is associated to the load conditions expected in the system. The technical analysis of shortcircuit and stability, show that with the entrance of the PV plant through any alternative, and during the ocurrence of any of the simulated events, the system presents an adequate behavior, keeping its variables within aceptable ranges, both in a stable and transient state. The economic evaluation results show that the Alternative 1 is better than the Alternative 2, because it has a higher B/C ratio and the investment costs are lower.spa
dc.format.extent57spa
dc.format.mimetypeapplication/pdfspa
dc.language.isospaspa
dc.type.hasversioninfo:eu-repo/semantics/draftspa
dc.rightsinfo:eu-repo/semantics/openAccessspa
dc.rights.urihttp://creativecommons.org/licenses/by-nc-sa/2.5/co/*
dc.titleApoyo en la elaboración de estudios de conexión: Estudio de conexión de Parque Solar de 60 MWspa
dc.typeinfo:eu-repo/semantics/bachelorThesisspa
oaire.versionhttp://purl.org/coar/version/c_b1a7d7d4d402bccespa
dc.rights.accessrightshttp://purl.org/coar/access_right/c_abf2spa
thesis.degree.nameIngeniero Electricistaspa
thesis.degree.levelPregradospa
thesis.degree.disciplineFacultad de Ingeniería. Ingeniería Eléctricaspa
thesis.degree.grantorUniversidad de Antioquiaspa
dc.rights.creativecommonshttps://creativecommons.org/licenses/by-nc-sa/4.0/spa
dc.publisher.placeMedellín - Colombiaspa
dc.type.coarhttp://purl.org/coar/resource_type/c_7a1fspa
dc.type.redcolhttps://purl.org/redcol/resource_type/TPspa
dc.type.localTesis/Trabajo de grado - Monografía - Pregradospa
dc.subject.lembCircuitos eléctricos-
dc.subject.lembCortocircuitos-
dc.subject.lembCostos marginales-
dc.subject.lembSistemas eléctricos-
dc.subject.spinesAnálisis económico-
dc.subject.spinesGeneración de energía eléctrica-
dc.subject.spinesPotencia (eléctrica)-
dc.subject.proposalFlujo de potenciaspa
dc.subject.proposalParque solarspa
Aparece en las colecciones: Ingeniería Eléctrica

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
AlvarezVladimir_2022_ElaboracionEstudioConexionTrabajo de grado de pregrado3.45 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons