Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/10495/35525
Título : Cálculos estructurales, fabricación y montaje puente grúa de 1 tonelada
Autor : Chavarría Jaramillo, Carlos Alberto
metadata.dc.contributor.advisor: Salazar Martínes, Silvio Andrés
metadata.dc.subject.*: Programa de ordenador
Computer software
Modelado
Modeling
Diseño
Design
Puente grúa
Cálculos
http://aims.fao.org/aos/agrovoc/c_2208
http://vocabularies.unesco.org/thesaurus/concept6081
Fecha de publicación : 2023
Resumen : RESUMEN : Se llevó acabo el proceso de ingeniería y administrativo para el suministro de un puente grúa con capacidad para 1 tonelada, para la máquina de etiquetas Omicrón 6, a la empresa Viappiani de Colombia, ubicada en la ceja, Antioquia. A partir de sus dimensiones, se realiza el modelo 3D del puente grúa, respetando los espacios de la misma, para cumplir con los requisitos del cliente. Se validó el modelo construido con cálculos de ingeniería, donde posteriormente se realiza la cotización del material necesario para su construcción en taller y se le presentó la cotización formal al cliente, luego de ser aceptada, se procedió con los procesos administrativos al interior de la empresa, esto es, solicitud de pedido de materiales, de personal y de fabricación a partir de los planos creados con el modelo 3D. Y por ultimo, se llevó a acabo la instalación del puente grúa.
ABSTRACT : The engineering and administrative process was carried out for the supply of a bridge crane with a capacity of 1 ton, for its new Omicron 6 labeling machine, to the company Viappiani de Colombia located in La Ceja, Antioquia. From its dimensions, the 3D model of the bridge crane is made, respecting the spaces of the same, to meet customer requirements. The constructed model was validated with engineering calculations, where later the quotation of the necessary material for its construction was made in the workshop and the quotation was presented to the client, after being accepted, the administrative processes within the company proceeded, that is, request for ordering materials, personnel and request for manufacturing from the plans created with the 3D model. And finally the installation of the bridge crane was carried out.
metadata.dc.relatedidentifier.url: https://drive.google.com/drive/u/0/folders/1VAZR_1Pgv0ISyy8ACrFULhTllp_ylFUh
Aparece en las colecciones: Ingeniería Mecánica

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
ChavarriaCarlos_2023_PuenteGruaFabricacion.pdfTrabajo de grado de pregrado21.25 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons