Por favor, use este identificador para citar o enlazar este ítem: https://hdl.handle.net/10495/26144
Registro completo de metadatos
Campo DC Valor Lengua/Idioma
dc.contributor.advisorOstos Cusba, Luis Fernando-
dc.contributor.advisorGonzález Rodríguez, Lina María-
dc.contributor.authorCalle Villegas, Diego Alberto-
dc.date.accessioned2022-02-22T12:00:06Z-
dc.date.available2022-02-22T12:00:06Z-
dc.date.issued2022-
dc.identifier.urihttp://hdl.handle.net/10495/26144-
dc.description.abstractRESUMEN : La depuración de contaminantes presentes en las aguas residuales industriales en la central termoeléctrica La Sierra EPM, se hace a través de la PTARI que consta básicamente de procesos primarios. Debido a la obsolescencia y falta de algunos equipos e instrumentos en la planta, se encontraron problemas de operación para el funcionamiento durante largos lapsos de tiempo, teniendo en cuenta que la capacidad de diseño no contaba con los vertimientos actuales. Además, a parte del monitoreo externo semestral no se existía ningún tipo de monitoreo interno de control para evaluar la eficiencia de remoción de los equipos y la calidad de agua a ser vertida. El objetivo del presente proyecto fue determinar la modernización de acuerdo con la obsolescencia tecnológica. Este proyecto se ejecutó en varias fases con el propósito de garantizar la operabilidad de la planta de acuerdo con la demanda del tratamiento. Se realizó un diagnóstico del estado de la planta y se siguió con los procesos de compra para recuperar los equipos dañados y faltantes, a la par se hizo un estudio e implementación de las principales metodologías de análisis para el seguimiento y control de la planta. De igual manera, se hizo un estudio de las condiciones de trabajo en la planta para mejorar los procesos de tratamiento utilizando como herramienta el análisis con las metodologías implementadas en EPM. Como resultados finales del proyecto se logró recuperar el funcionamiento total de la planta, aumento de las eficiencias de remoción de contaminantes y monitoreo para ejecutar decisiones en el proceso.spa
dc.description.abstractABSTRACT : The contaminants removal presents in industrial wastewater at the La Sierra EPM thermoelectric plant is done through the IWTP which basically consists of primary processes. Due to the obsolescence and lack of some equipment and instruments in the plant, operational problems were found for operation for long periods of time, considering that the design capacity did not include the current discharges. In addition, apart from the six-monthly external monitoring, there was no type of internal control monitoring to evaluate the removal efficiency of the equipment and the quality of the water to be discharged. The objective of this project was to determine the modernization of the IWTP according to technological obsolescence. This project was executed in different phases with the purpose to warranty the operability of the plant in accordance with the treatment demand. An analysis of the state of the plant was carried out and the purchase processes were continued to recover both the damaged and missing equipment, at the same time a study and implementation of the main analysis methodologies for the monitoring and control of the plant was carried out. Likewise, a study of the working conditions in the plant was carried out to improve the treatment processes using analysis with the methodologies used in EPM as a tool. As final results of the project, it was possible to recover the total operation of the plant, increase in the efficiency of removal of contaminants and monitoring to make decisions in the process.spa
dc.format.extent108spa
dc.format.mimetypeapplication/pdfspa
dc.language.isospaspa
dc.type.hasversioninfo:eu-repo/semantics/draftspa
dc.rightsinfo:eu-repo/semantics/openAccessspa
dc.rights.urihttp://creativecommons.org/licenses/by-nd/2.5/co/*
dc.titleModernización y optimización de la planta de tratamiento de agua residual industrial de la central termoeléctrica La Sierra EPMspa
dc.typeinfo:eu-repo/semantics/bachelorThesisspa
oaire.versionhttp://purl.org/coar/version/c_b1a7d7d4d402bccespa
dc.rights.accessrightshttp://purl.org/coar/access_right/c_abf2spa
thesis.degree.nameIngeniero Químicospa
thesis.degree.levelPregradospa
thesis.degree.disciplineFacultad de Ingeniería. Ingeniería Químicaspa
thesis.degree.grantorUniversidad de Antioquiaspa
dc.rights.creativecommonshttps://creativecommons.org/licenses/by-nc-sa/4.0/spa
dc.publisher.placeMedellínspa
dc.type.coarhttp://purl.org/coar/resource_type/c_7a1fspa
dc.type.redcolhttps://purl.org/redcol/resource_type/TPspa
dc.type.localTesis/Trabajo de grado - Monografía - Pregradospa
dc.subject.unescoModernización-
dc.subject.unescoModernization-
dc.subject.unescoOptimización-
dc.subject.unescoOptimization-
dc.subject.lembCentrales termoeléctricas-
dc.subject.lembPlantas para tratamiento de aguas residuales-
dc.subject.agrovocAguas residuales industriales-
dc.subject.agrovocIndustrial wastewater-
dc.subject.agrovocCalidad del agua-
dc.subject.agrovocWater quality-
dc.subject.agrovocCarga contaminante-
dc.subject.agrovocPollutant load-
dc.subject.agrovocurihttp://aims.fao.org/aos/agrovoc/c_25311-
dc.subject.agrovocurihttp://aims.fao.org/aos/agrovoc/c_16061-
dc.subject.agrovocurihttp://aims.fao.org/aos/agrovoc/c_25306-
dc.subject.unescourihttp://vocabularies.unesco.org/thesaurus/concept7001-
dc.subject.unescourihttp://vocabularies.unesco.org/thesaurus/concept6659-
Aparece en las colecciones: Ingeniería Química

Ficheros en este ítem:
Fichero Descripción Tamaño Formato  
CalleDiego_2022_ModernizacionPlantaTratamiento.pdfTrabajo de grado de pregrado2.74 MBAdobe PDFVisualizar/Abrir


Este ítem está sujeto a una licencia Creative Commons Licencia Creative Commons Creative Commons